Building Strong® at Westport Slough

Westport Slough, as shown by Google Earth ProThe Westport Slough channel is authorized to 28 feet deep and 200 feet wide, from deep water in the Columbia River into Westport Slough to the ferry dolphin at Westport, Ore. The project is across from the Wahkiakum Ferry channel in Washington.

 

Until recently, the navigation channel was maintained to a 9-foot depth, adequate for the Wahkiakum Ferry, a vital interstate transportation link for the entire Lower Columbia region. The ferry runs between Cathlamet in Wahkiakum County, Wash. and Westport in Clatsop County, Ore. The ferry carries more than 50,000 vehicles each year; it's not only the most energy-efficient local travel option, it also provides a critical alternative route for interstate traffic when the nearest bridges (26 miles upstream or 43 miles downstream) or highways are closed by weather, traffic accidents, or other causes.

 

Wahkiakum County completed a $2.8 million ferry terminal upgrade investment in 2010, and plans to put a new, larger $3.9 million ferry vessel into service in 2014. Clatsop County plans $2.4 million in improvements to the ferry landing at Westport to accommodate the new ferry. Federal and State funds are contributing to these investments. The new ferry will have double the capacity for vehicles, and its larger deck will hold tour buses and trucks.

 

The return of ocean-going deep draft barge traffic to Westport Slough channel now requires increased dredging to maintain a 20-foot depth.

For more information

Contact us:

Phone: 503-808-4510

Email us about the Westport Slough

Latest News Releases

Corps Hosts Info Session for Rogue River Basin Water Levels
6/7/2023
U.S. Army Corps of Engineers water managers for the Rogue River Basin will hold a virtual information to provide an updated outlook on the summer conservation season for the basin...
Road NF-1993 across Cougar Dam closed for construction
6/5/2023
The U.S. Army Corps of Engineers (USACE) will close the portion of Road NF-1993 that runs along the crest of Cougar dam to traffic in both directions, from June 5 to Sept. 28. The road will reopen...
500% Greater Risk of Drowning due to Cold Water at Start of Summer
5/22/2023
As millions of Americans head out on the water to enjoy the warmer weather, recreation managers with the U.S. Army Corps of Engineers are urging caution for the Memorial Day holiday...

Operations: Westport Slough

Collapse All Expand All

The vertical plane of reference is adopted low water. The project is subject to tidal influences and annual river freshets. A large shoal regularly forms at the mouth of Westport Slough (where the slough empties into the Columbia River), requiring dredging by a contract clamshell dredge every 2 to 3 years for adequate depth to allow ferry passage. It was last dredged in early 2010; the material was placed at an in-water site. The remainder of the channel shoals more slowly, but may need additional dredging to maintain adequate depth for ocean-going deep draft barge traffic. A clamshell dredge is needed to clear the channel to 20 feet for barge traffic, with dredged material placed at an in-water or an upland site.

Limited advanced maintenance width dredging outside the authorized channel width and up to 2 feet of advanced maintenance dredging below the authorized channel depth is practiced in order to maintain adequate depth for the users between dredging events.

Authorized channel 28 feet deep and 200 feet wide, from deep water in the Columbia River at Columbia River Mile 43, into Westport Slough to the ferry dolphin at Westport, Ore.
The Rivers and Harbors Act of August 26, 1937.