News Releases

Results:
Tag: salmon
Clear
  • Corps assessing future of hydropower production in Willamette Valley

    In two virtual public information sessions, the Portland District, U.S. Army Corps of Engineers will discuss the role of hydropower at their Willamette Valley dams, and how they’re answering Congress’ call to look at the future of that hydropower.
  • Corps to begin deep drawdowns at Green Peter, Lookout Point

    Beginning in June, the Portland District, U.S. Army Corps of Engineers will begin to gradually drawdown Lookout Point and Green Peter reservoirs to historically low levels. The goal of these reservoir “drawdowns,” which are part of an injunction ordered by the U.S. District Court for the District of Oregon, is to increase juvenile spring Chinook and steelhead survival and passage through the reservoirs and past the dams.
  • Delayed refill at Corps reservoirs to impact boating, recreation

    Army water managers will delay refilling Cougar and Fall Creek reservoirs and conduct spill operations at Foster Dam as required by the U.S. District Court for the District of Oregon’s Willamette Valley injunction because of recent litigation. The delay at Cougar and Fall Creek will impact the U.S. Army Corps of Engineers’ (Corps) ability to refill the reservoirs to their normal summer levels, which will impact boating and recreation activities.
  • Fish hatchery power problems continue, likely impacting more brood years

    Army engineers and biologists expect power problems at Cole M. Rivers hatchery, in southern Oregon, to impact at least one additional brood year of fish. U.S. Army Corps of Engineers (Corps) officials had earlier hoped the power failure to only affect one brood year.
  • Corps considers future changes that may impact Willamette Valley System operations, maintenance

    Army engineers and planners are considering major changes that may impact the continued operations and maintenance of the Willamette Valley System (WVS). U.S. Army Corps of Engineers (Corps) staff continue developing an Environmental Impact Statement (EIS) for WVS operations and maintenance in accordance with authorized project purposes, while meeting Endangered Species Act (ESA) obligations to avoid jeopardizing the continued existence of listed species.
  • Power disruption, aging infrastructure impact fish hatchery

    The main electrical power feeder from Lost Creek Dam to the Cole M. Rivers Hatchery failed at the end of April 2021. Since then, U.S. Army Corps of Engineers (Corps) has been working to repair the line and Oregon Department of Fish and Wildlife (ODFW) staff have assisted as needed.
  • Corps modifies operations to improve salmon passage at Detroit Dam

    The U.S. Army Corps of Engineers is modifying operations at Detroit Dam to improve juvenile salmon downstream passage survival by releasing water exclusively through the upper regulating outlets when downstream passage rates are high.
  • Fall Creek Adult Fish Facility – Improving eFishencies

    The U.S. Army Corps of Engineers report a record return of more than 800 spring chinook salmon this year at Fall Creek Dam.
  • Corps begins flexible spring spill operations to benefit fish and hydropower

    The U.S. Army Corps of Engineers began implementing its 2020 Fish Operations Plan at the four lower Snake River dams April 3 and at the lower Columbia River dams April 10.
  • Corps begins spring spill operations with new flexibility to benefit fish and hydropower

    The U.S. Army Corps of Engineers will begin implementing its 2019 Fish Operations Plan at the four lower Snake River dams April 3, and at the lower Columbia River dams April 10. The 2019 plan includes spill and transport operations for the spring and summer juvenile fish passage seasons at these dams, as specified in the NOAA Fisheries 2019 Columbia River System Biological Opinion.

How to Subscribe to RSS

Edge Browser Instructions
1. Visit the Microsoft Edge Add-on store: https://microsoftedge.microsoft.com/addons/Microsoft-Edge-Extensions-Home.
2. Search for “rss feed reader”:
3. Click “Get” Next to “Feeder – RSS Feed Reader”, then Confirm by clicking “Add Extension”
4.​ Setup your feeds: Search for feeds one-by-one, browse the library of sites or import feeds with OP

Microsoft Outlook Instructions
1. In Outlook, right-click the RSS Feeds folder and choose Add a New RSS Feed.
2. In the New RSS Feed dialog box, enter the URL of the RSS Feed.
Enter the URL for the RSS Feed

Tip: If you need help finding the RSS feed URL on a website, look for an RSS icon.
 Button image Right-click that icon, and then copy the shortcut to the Clipboard.
Press Ctrl+V to paste the information from the Clipboard into the RSS Feed location box.
Choose Add > OK.Additional Subscription Information: Microsoft How to Subscribe to RSS feed in Outlook

Google Chrome Instructions
Chrome Extension allows RSS Feed Subscriptions

Free RSS Feed Reader
https://feeder.co