News Releases

Results:
Tag: Long Tom River
Clear
  • Corps, partners host Long Tom River dam modification info session

    The City of Monroe, Oregon, and the Confederated Tribes of Siletz Indians have entered an agreement with the U.S. Army Corps of Engineers (Corps) to study the feasibility of improving fish passage near the Monroe drop structure on the Long Tom River. Public participation and feedback are important, and the Corps and its partners will seek input during an info session Nov. 3, 4-5 p.m.
  • Fern Ridge Reservoir water levels to decrease

    The Portland District, U.S. Army Corps of Engineers will increase releases from Fern Ridge Reservoir beginning Monday. Outflows from the dam will gradually increase for the next three weeks. The Corps anticipates water levels in Fern Ridge will drop to 371 feet by September 10, 370.5 feet by September 17 and 369.5 feet by September 24. This will increase flows downstream by about half a foot each week at the Long Tom River gage at Monroe. In October, the Corps will continue to adjust flows to drawdown the reservoir for winter flood-season operations.