The United States Congress authorizes the U.S. Army Corps of Engineers to regulate activities that may impact wetlands and waters of the United States. This authority is granted and defined under Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Federal Water Pollution Control Act Amendments of 1972, also known as the Clean Water Act.

Public involvement is a key element of the Corps’ permit review process. During an application review, the Corps considers the views of other federal, state and local agencies, Native American tribes, interest groups, and the general public. The results of this careful public interest review are fair and equitable decisions that allow reasonable use of private property, infrastructure development, and growth of the economy, while offsetting the authorized impacts to the waters of the United States.

Visit our News & Updates webpage for the latest Regulatory Program information.

NWP-2003-754-5

Published Sept. 25, 2020
Expiration date: 10/19/2020

PUBLIC NOTICE
Application for Permit

Issue Date: September 17, 2020
Expiration Date: October 19, 2020
US Army Corps of Engineers No: NWP-2003-754-5 
Oregon Department of State Lands No: 62593-RF

30-Day Notice

Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps) has received an application for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plans. The Corps is soliciting comments on the proposed work.

Applicant: Clatsop County Public Works 
Attention: Terry Hendryx
1100 Olney Avenue
Astoria, Oregon 97103
E-mail: thendryx@co.clatsop.or.us
Telephone: (503) 325-8631

Location: The project site is located at the Westport Ferry Landing, at the west end of Westport Ferry Road, in Westport, Clatsop County, Oregon. The site is in Section 36, Township 8 North, Range 6 West. Latitude and Longitude: 46.137123 North, 123.378634 West

The disposal site is located within the Columbia River at River Mile 39.8. Latitude and Longitude: 46.1838 North, 123.4317 West

Waterway: The Westport Slough and Columbia River. The location of the ordinary mean high water shown on the project drawings have not yet been verified by the Corps. If the Corps determines the boundaries of the waters are substantially inaccurate a new public notice may be published.

Project Purpose: The applicant’s stated purpose is to remove the sediment restricting the safe continued use of the ferry and the reconstruction of three log vanes to redirect bedload of Plympton Creek away from the ferry landing to minimize duration between needed maintenance dredging. 

Project Description: The applicant proposes to dredge and replace existing log vanes at the Westport Ferry Landing within the Westport Slough. Dredging would include the removal of up to 453 cubic yards of material from within 0.26 acre of the Westport Slough. The dredge prism would be dredged to a maximum depth of -15 mean lower low water (MLLW). Dredging would be completed using a barge mounted crane and clamshell bucket. The material would be loaded onto a live-bottom barge for in-water disposal within the flow lane of the Columbia River at river mile 39.8. Prior to dredging, the ferry ramp would be removed to allow for access and then placed back upon completion of the activities. 

The existing log vanes along the Plympton Creek channel would be replaced. The log vanes redirect bed load entering the Westport Slough from Plympton Creek away from the Ferry Ramp. The replacement of log vanes includes replacing six pilings. The new pilings would be untreated wood with a minimum 8-inch diameter at the driving tip and 36-inch diameter three feet from the bottom of the piling. Log vanes are constructed of three 25-foot logs, and the bottom log of each vane would have a rootwad. Pilings would be replaced using a barge mounted vibratory hammer. 

Dredged Material Testing: The proposed dredged material will be evaluated in accordance with the Sediment Evaluation Framework for the Pacific Northwest (SEF). The interagency Portland Sediment Evaluation Team (PSET) implements the SEF for the Corps Portland District. The PSET will determine if sediment testing is required for this project. Project sediments may require physical, chemical, and/or biological testing to support the permit application evaluation. The PSET will evaluate the applicant’s sediment testing results and determine if project sediments are suitable for unconfined, aquatic disposal or exposure. 

The proposed project includes future maintenance dredging. Prior to each maintenance dredging cycle the applicant would be required to coordinate with the Corps and the PSET to determine if additional sediment testing is required.

Mitigation: The applicant proposes to avoid and minimize impacts from the project by conducting the work during the Oregon Department of Fish and Wildlife preferred in-water work window of November 1 through February 28. The applicant did not propose compensatory mitigation in the permit application. The Corps will determine the type and amount of compensatory mitigation necessary to offset environmental losses from the proposed project.

Drawings: Ten (10) drawings are attached and labeled Corps No.: NWP-2003-754-5 Copies of this public notice, which have been mailed or otherwise physically distributed, feature project drawings in black and white. The electronic version features those drawings in color, which we think more accurately illustrates the proposed project. To access the electronic version of this public notice, go to the Portland District Regulatory website at http://www.nwp.usace.army.mil/Missions/Regulatory and select Regulatory Public Notices from the list of Regulatory pages.

Authority: The proposed project will be evaluated under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.

Section 14, Rivers and Harbors Act 1899 (33 U.S.C. 408) (referred to as “Section 408”), for work to alter a Corps civil works project. An alteration is defined as any action that builds upon, alters, improves, moves, occupies or otherwise affects the usefulness, or the structural or ecological integrity of a Corps federally authorized project. The proposed project may alter the Columbia River Navigation Channel. 

Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.

Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated for compliance with guidelines promulgated by the U.S. Environmental Protection Agency under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the substantive criteria used in evaluating discharges of dredged or fill material into waters of the United States. The source of discharged material would be the accumulated sediment from the Westport Ferry Landing dredge prism.

Coastal Zone Management: Section 307(c) of the Coastal Zone Management Act of 1972, as amended (16 U.S.C. 1456(c), requires non-Federal applicants seeking a federal license or permit to conduct any activity occurring in or affecting the coastal zone to obtain a Consistency Certification which indicates the activity conforms with the State’s Coastal Zone Management Program. The applicant believes the proposed project would comply with and be conducted in a manner consistent with the Oregon Ocean and Coastal Management Program. Attached is the state's notice for a consistency certification.

Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C. 1536) requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or that may adversely modify designated critical habitat. The Corps’ preliminary review indicates the described activity may affect an endangered or threatened species or designated critical habitat. The Corps will initiate consultation under Section 7 of the ESA. The Corps will complete the required consultation prior to finalizing a permit decision.

Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and Management Act (MSA) as amended (16 U.S.C. 1855), requires Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps’ preliminary review indicates the described activity would adversely affect EFH at the project location or in the vicinity. The Corps will initiate consultation under Section 305(b)(2) of the MSA. The Corps will complete the required consultation prior to finalizing a permit decision.

Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended (54 U.S.C. 306108), requires Federal agencies to consult with the appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of actions they undertake or permit on historic properties listed in or eligible for listing in the National Register of Historic Places. The Corps’ preliminary review indicates to the best of our knowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Register of Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area. 

This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager identified at the end of this notice to assist in a complete evaluation of potential effects.

State and Local Authorizations: The applicant has obtained approval from Clatsop County and will be applying for the following additional governmental authorizations for the project: Department of State Lands Removal / Fill permit, Department of Environmental Quality 401 Water Quality Certification, and the Department of Land Conservation and Development Coastal Zone Management consistency determination.

Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.

Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.

The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed activity. Any comments received will be considered by the Corps to determine whether to allow an alteration of a federally authorized project or to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Submitting Comments: Interested parties are invited to provide comments on the proposed project. Comments may be submitted by conventional mail or e-mail. All comments received will be considered in determining whether authorizing the work would be contrary to the public interest. 

Either conventional mail or e-mail comments must include the Corps reference number as shown on page 1 and include the commenter’s name and address. In order to be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the Corps reference number. All comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act including any personally identifiable information such as names, phone numbers, and addresses.

Additional information about the proposed project may be obtained from the Corps Project Manager listed below. All comments, whether by conventional mail or e-mail, must be received no later than the expiration date of this public notice to ensure consideration. Comments should be submitted to the following mailing address or 
e-mail address:

U.S. Army Corps of Engineers
Regulatory Branch
Brad Johnson 
P.O. Box 2946
Portland, Oregon 97208-2946
E-mail: Brad.A.Johnson2@usace.army.mil
Telephone: (503) 808-4383

PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification

Notice Issued: September 17, 2020
Written Comments Due: October 19, 2020

Corps of Engineers No: NWP-2003-754-5
Oregon Department of State Lands No: 62593-RF

WHO IS THE APPLICANT: Clatsop County Public Works

LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice.

WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project.

NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state.

DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project.

WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Permit Coordinator, Northwest Region, 700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are available by contacting the Corps per the attached public notice.

Scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5623.

Any questions on the water quality certification process may be addressed to the 401 Permit Coordinator at (503) 229-5623 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at (800) 735-2900.

PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that “The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing.” 

Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed or mailed as described below: 

Email - 401publiccomments@deq.state.or.us

Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232 
Attn: 401 Water Quality Permit Coordinator 

WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address.

ACCESSIBILITY INFORMATION: DEQ can provide documents in an alternate format or in a language other than English upon request. Call DEQ at (800) 452-4011 or e-mail: deqinfo@deq.state.or.us

PUBLIC NOTICE
OREGON OCEAN AND COASTAL MANAGEMENT PROGRAM
CONSISTENCY CERTIFICATION

Date: September 17, 2020

U.S. Army Corps of Engineers No: Corps No.: NWP-2003-754-5
Oregon Department of State Lands No: 62593-RF 

NOTIFICATION:
For projects subject to coastal zone review, notice is hereby given that the project is being reviewed by the Department of Land Conservation and Development (DLCD) as provided in Section 307(c) of the Coastal Zone Management Act. The applicant believes that the activities described in the attached materials would comply with and be conducted in a manner consistent with the Oregon Ocean and Coastal Management Program. Project information can be made available for inspection at DLCD's Salem office.

DLCD is hereby soliciting public comments on the proposed project's consistency with the Oregon Coastal Management Program. Written comments may be submitted to DLCD, 635 Capital Street NE, Suite 150, Salem, Oregon 97301-2540. Comments may also be sent by fax to (503) 378-6033 or by email to coast.permits@state.or.us. All comments must be received by DLCD on or before the comment deadline listed in the accompanying Corps of Engineers’ Public Notice Application for Permit. For further information, you may call DLCD at (503) 373-0050.

REVIEW CRITERIA:
Comments should address consistency with the applicable enforceable policies of the Oregon Coastal Management Program. These enforceable policies are found in the following:

• Acknowledged Local Comprehensive Plans & Implementing Ordinances
• Statewide Planning Goals
• Applicable State Authorities incorporated into the Oregon Coastal Management Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) as applicable.

A list of specific enforceable policies can be found at the following link:
http://www.oregon.gov/LCD/OCMP/Pages/OCMP_Enforceable-Policies.aspx

INCONSISTENT?
If you believe this project is inconsistent with the Oregon Coastal Management Program, your comments to DLCD should explain why you believe the project is inconsistent and should identify the Oregon Coastal Management Program element(s) in question. You should also describe how the project could be modified, if possible, to make it consistent with the Oregon Coastal Management Program.