Portland District

Home
Home > Media > Public Notices > Permit Application Article

FILTER:
environmental




MCR North Head Draft EA and FONSI - 1/26/2018: Interested parties are hereby notified that the U.S. Army Corps of Engineers, Portland District (Corps) is seeking public comments on the Draft Environmental Assessment for the Mouth of the Columbia River Dredged Material Placement Sites Update: Clatsop County, Oregon and Pacific County, Washington (EA).
Expiration date: 2/24/2018


The Corps and Columbia River Ports jointly preparing an environmental impact statement (EIS) for The Lower Columbia River Federal Navigation Channel Maintenance Plan - 9/8/2017: Interested parties and tribes are hereby notified that the Portland District of the Corps and the Sponsor Ports are preparing a joint Environmental Impact Statement (EIS) for The Lower Columbia River Federal Navigation Channel Maintenance Plan (Plan) and are seeking public input during an extended scoping period, from September 8 through November 16, 2017.
Expiration date:

Final EA and FONSI: Columbia Stock Ranch - 7/25/2016: The final environmental assessment for the Columbia Stock Ranch Section 536 Ecosystem Restoration Project and the U.S. Army Corps of Engineers, Portland District’s Finding of No Significant Impact is available.
Expiration date:


Final EA and FONSI: Trestle Bay Restoration Project - 7/21/2015: The proposed action, to implement a restoration project improving access to fish habitat in Trestle Bay, will not significantly affect the quality of the human environment and an environmental impact statement is not required. Restoring access to Trestle Bay will result in long term benefits for juvenile salmonids by improving access/egress to important shallow-water habitat.
Expiration date:


Oaks Bottom draft Feasibility Report and EA - 7/14/2015: The U.S. Army Corps of Engineers, Portland District is seeking public comments on the Draft Integrated Feasibility Report and Environmental Assessment for Oaks Bottom Section 206 Habitat Restoration Project in Multnomah County, Oregon.
Expiration date:


FONSI: Dairy Creek Restoration Project - 3/24/2015: Finding of No Significant Impact Dairy Creek Restoration Project Sauvie Island, Oregon I find the proposed action, described as the Preferred Alternative in the Dairy Creek Restoration Feasibility Study and Environmental Assessment Report, Sauvie Island, OR (Project; U.S. Army Corps of Engineers, Portland District – [USACE], January 2015)
Expiration date:


Draft EA: Trestle Bay Restoration Project - 3/13/2015: Interested parties are hereby notified that the U.S. Army Corps of Engineers, Portland District, (Corps) is seeking public comment on the Trestle Bay Restoration Project, Draft Environmental Assessment (Draft EA).
Expiration date:


Final EA, FONSI: Fall Creek Dam fish enhancement - 11/24/2014: The selected course of action is for the drawdown of Fall Creek Reservoir to occur annually on a permanent basis as described as the Preferred Alternative in the Final Environmental Assessment, Downstream Fish Enhancement for Juvenile Salmonids at Fall Creek Dam, Lane Co., Ore.
Expiration date:


Draft EA: Fall Creek adult fish facility upgrade - 11/12/2014: Public comment is being sought on this draft environmental assessment for the Fall Creek Dam and Reservoir adult fish facility upgrade.
Expiration date: