News Releases

Corps announces scoping and public meetings for Cormorant Environmental Impact Statement

Published Oct. 29, 2012
The Corps of Engineers has contracted a study of double-crested cormorant nesting sites on East Sand Island, located north of Astoria on the Washington coast.

The Corps of Engineers has contracted a study of double-crested cormorant nesting sites on East Sand Island, located north of Astoria on the Washington coast.

The Corps of Engineers has contracted a study of double-crested cormorant nesting sites on East Sand Island, located north of Astoria on the Washington coast.

The Corps of Engineers has contracted a study of double-crested cormorant nesting sites on East Sand Island, located north of Astoria on the Washington coast.

PORTLAND, ORE. – The U.S. Army Corps of Engineers has kicked off its public scoping process and scheduled public meetings to prepare a draft environmental impact statement to manage a large colony of double-crested cormorants nesting on East Sand Island in the Columbia River estuary.

The double-crested cormorant colony on East Sand Island has grown from 100 nesting pairs in 1989 to an estimated 13,000 nesting pairs in 2011, the largest single-colony in western North America. The species is protected under the Migratory Bird Treaty Act. This increase has led to concerns over their potential impact on the recovery of threatened and endangered Columbia River basin salmonids listed under the Endangered Species Act.

An interagency working group was formed in 2010 to address the role of double-crested cormorant predation in the estuary on the recovery of ESA-listed salmon. No decisions have been made regarding how to manage the colony. The group identified preliminary management alternatives, which included reducing the colony size on East Sand Island. 

The full range of management alternatives to address the predation will be developed through the scoping process. Methods to reduce the colony’s size could involve a combination of actions to dissuade cormorants from nesting on the island. These actions may include modifying available habitat; conducting hazing activities during the nesting season to prevent colony establishment; selecting a lethal component (collection of eggs, nests and/or possible take of adults); and monitoring cormorants as they leave the island to determine the potential impacts of their dispersal.

The Corps of Engineers, as the lead agency for the EIS, is working with its cooperating agencies: U.S. Fish and Wildlife Service, U.S. Department of Agriculture –Animal Plant Health Inspection Service - Wildlife Services and Washington Department of Fish and Wildlife.  Representatives from the Corps and the cooperating agencies will be on hand to discuss concerns or comments in an open house format. The meetings will be facilitated to encourage information sharing.

Nov. 8, 2012 - Olympia, Wash.
5 p.m. -8 p.m.
Phoenix Inn
415 Capitol Way N
Olympia, WA 98501
 
Nov. 13, 2012- Portland, Ore.
5 p.m. -8 p.m.
Red Lion Lloyd Center
1021 NE Grand Avenue
Portland, OR 97232

Nov. 15, 2012 - Astoria, Ore.
5 p.m. -8 p.m.
Holiday Inn Express
204 West Marine Drive
Astoria, OR 97103

Members of the public are encouraged to visit the Corps’ website for the EIS at http://www.nwp.usace.army.mil/Missions/Currentprojects/CormorantEIS.aspx , to learn more about the issues and research concerning double-crested cormorants in the estuary, to find a schedule for the draft EIS and to sign up for a mailing list to receive updates during the EIS process. The public is strongly encouraged to review the materials on the website, contact the Corps for additional information and attend one of three public meetings in November. 

Comments may be made in writing, electronically, by mail or over the phone. Comments will be categorized and summarized in a scoping report and used to inform the Corps’ decision-making process. This is not the only opportunity for the public to provide input. There will be additional opportunities to comment during the EIS process.   Mailed comments must be postmarked by Dec. 21, 2012 and sent to:

Sondra Ruckwardt, Project Manager
Attn: CENWP-PM-E-12-06
U.S. Army Corps of Engineers, Portland District
P.O. Box 2946 Portland, Oregon 97208 
Phone: 503-808-4691
Email: Cormorant-EIS@usace.army.mil

The Corps of Engineers is the federal land manager of East Sand Island and the lead agency under the National Environmental Policy Act for the EIS. A Notice of Intent was published in the Federal Register on July 19, 2012, that announced the Corps’ proposal to prepare a DEIS.

- 30 -


Release no. 12-058

How to Subscribe to RSS

Edge Browser Instructions
1. Visit the Microsoft Edge Add-on store: https://microsoftedge.microsoft.com/addons/Microsoft-Edge-Extensions-Home.
2. Search for “rss feed reader”:
3. Click “Get” Next to “Feeder – RSS Feed Reader”, then Confirm by clicking “Add Extension”
4.​ Setup your feeds: Search for feeds one-by-one, browse the library of sites or import feeds with OP

Microsoft Outlook Instructions
1. In Outlook, right-click the RSS Feeds folder and choose Add a New RSS Feed.
2. In the New RSS Feed dialog box, enter the URL of the RSS Feed.
Enter the URL for the RSS Feed

Tip: If you need help finding the RSS feed URL on a website, look for an RSS icon.
 Button image Right-click that icon, and then copy the shortcut to the Clipboard.
Press Ctrl+V to paste the information from the Clipboard into the RSS Feed location box.
Choose Add > OK.Additional Subscription Information: Microsoft How to Subscribe to RSS feed in Outlook

Google Chrome Instructions
Chrome Extension allows RSS Feed Subscriptions

Free RSS Feed Reader
https://feeder.co