Images

Mount St. Helens spillway raise
LKE owner Kim Erion explains the spillway raise project to LDN reporter Andre Stepankowsky and Corps project manager Tim Kuhn. The U.S. Army Corps of Engineers and contractor LKE Corporation raise the spillway at the Mount St. Helens Sediment Retention Structure by nearly 10 feet. The spillway raise project will trap sediment in the Toutle River before it flows downstream.

Download Image: Full Size (4.14 MB)
Photo by: Diana Fredlund |  VIRIN: 121003-A-AH115-001.JPG