Images

John Day gate repair work progresses
A barge with two new navigation lock friction sheaves and a Manitowoc Model 888 crane passes through Bonneville Lock and Dam on Dec. 1, 2010, heading for John Day Lock and Dam. Photos of the JD gate sections and crane moored just below the navlock, and a tug moving the floating bulkhead into position to seal the downriver entry prior to dewatering, which began Dec. 10, 2010.

Download Image: Full Size (2.58 MB)
Tags: John Day
Photo by: David Mackintosh |  VIRIN: 101212-A-JM613-002.JPG